Project Advantages
1.Short Installation Time, High Efficiency
All tank modules are prefabricated in the factory. On-site assembly only requires bolt connections, allowing each 7000m³ tank to be installed within 2 weeks on average.
2.Minimal Weather Impact, All-Season Construction
The non-welded design enables construction in rainy or humid environments, ideal for regions with frequent rain. Project timelines are more predictable and controllable.
3.High-Level Safety Design
The tank roof is made of 316L stainless steel, offering excellent corrosion resistance. It also supports the high load of the central PRG mixing system, ensuring safe and stable operation.
4.Easy Maintenance, Low Operating Costs
The fully bolted structure simplifies future disassembly and maintenance. No welding is required, making operation safer and reducing maintenance costs.
5.Standardized Manufacturing, High Precision
All components are processed with advanced laser cutting and CNC bending, ensuring tight assembly, high precision, and excellent sealing performance.

Client Testimonials
“This was our first time using a fully bolted stainless steel anaerobic tank. The installation was almost twice as fast as traditional welded tanks, and the quality was much more controllable. After commissioning, the system has been running smoothly with excellent mixing performance. It gave us a fresh perspective for future projects.”
— Mr. Li, Project Lead, Jingzhou Site
“From design to delivery, the process was highly efficient. The Baoxuan team was responsive and professional, and the on-site installation gave us full confidence. After more than six months of operation, the tank has performed consistently well, with high client satisfaction.”
— Mr. Zhou, Site Manager, Changsha Project